Menu
Totally Sound
WA's most respected Audio Visual company
  • Home
  • Hire
  • Sales
  • Service & Installation
  • Events
  • News
  • Contact
  • 08 9725 4599
  •  
Close Menu

St Mary’s Primary School Hall Installation

The crew at Totally Sound have been busy installing a sound system in the new hall at St Mary’s Primary School in Bunbury.  The multizone system is designed to allow flexibility for a variety of applications in this multipurpose space.  Controlled by a Nexia CS Digital Audio Processor, the system allows for presets to be stored and recalled as required.  Microphones include 6 radio (2 hand held, 4 headset), three choir mics and two vocal mics.  The system also has ipod and laptop connectivity.

New Norcia Abbey Chapel Sound System Upgrade Georgiana Molloy Anglican School Hall Installation

Related Posts

Margaret-River-Heart

Installations

Margaret River Hub of Entertainment, Arts and Regional Tourism (HEART) AV Installation

Tour-and-tour-operator

Installations

Busselton Jetty – Underwater Observatory Experience

VDG_ENABLE-5

Installations

Enable WA – Conference Room

Back To Top
Totally Sound

Discover the difference Totally Sound can make to your event or business

We're Local

We're Local

Professionalism Matters

Professionalism Matters

Quality Equipment

Quality Equipment

Fully Licensed

Fully Licensed

Perfectly Maintained

Perfectly Maintained

eia-logo
Cinefest Oz
© Totally Sound 2021